Skip to content

Lifting Frames

Home / Projects / Fabrication / Lifting Frames

aws-logo-color

Elite Welding has fabricated several lifting and handling frames and due to material availability, the main beams typically need to be spliced together to achieve lengths up to 75 feet long. The use of AWS-certified welders and practices made the UT & MT inspections easy to pass and before these are put into service they undergo a series of crane load testing.

Have a project we can help with?

If you're ready to see how Elite Welding can help, please fill out the form to contact us and we will get back with you as soon as possible.

  • Automotive
  • Industrial & Commercial Construction
  • Power Industry
  • Material Handling
  • Maintenance

Name(Required)
✓ Valid number ✕ Invalid number
I am interested in these services:
This field is for validation purposes and should be left unchanged.